MRT
Lead Through Expertise  

Appartment Buildings

       
Student Dormitory Olympic Village Munich MUCOWF

Client: Zuber Beton Crailsheim

Assembly of parapet elements and lightweight concrete curtain facades in height of up to 55 m with cranes and truck working platforms

 

2011

-

2010

            
       
KV Släden, Stockholm, Sweden

Client: PRAEFA

Assembly and structural work, Släden residential and office building; assembly of prefabricated parts, steel construction installation, in-situ concrete /filigree floors, façade and balcony assembly, assembly performed during the winter at temperatures reaching -22 °C.

 

2011

-

2010

                  
       
Villa Sködstrup, Denmark

Client: Bo Gram Larsen

Turnkey erection of a low-energy house in wooden frame construction with clinked exterior facade

 

2010

-

2009

     
       
Solbärparken residential complex, Kopenhagen, Denmark

Client: Dyrlund Sörensen A/S

Assembly of a residential complex in multi-story construction with sandwich clinker facades

 

2008

                
       
Östbrogunden resitential & shopping center, Copenhagen

Client: Hoffmann A/S

Structural and assembly work of a shopping center and 115 apartments, 2 parking decks and one railway station’s adjoining building (mall). Assembly of columns, beams, trusses, hollow ceilings, pre-stressed concrete balconies, filigree bubble ceilings, steel construction elements as well as sandwich and curtain facades. Installation of all in-situ concrete foundations.

 

2008

-

2006

                
       
Valby townhouses, Copenhagen, Denmark

Client: Dyrlund Sörensen A/S

Assembly of 211 townhouses

 

2008

-

2006

                  
       
Villa Vestergaard, Aarhus, Denmark

Client: Riela Consult

Construction of a villa using in-situ concrete; peculiarity: double cellar in the Baltic Sea groundwater and approx. 80 m away from the beach

 

2008

-

2006

            
       
Berlin Britz townhouses

Client: CD Schmidt Berlin

Structural and assembly work

 

2004

-

2003

                
       
Hennigsdorf nursery home

Client: Allton

Assembly of a nursing home with the multi-story construction method

 

2003

        
       

 

MRT