Industrial and Commercial Structures

       
Fine Food Wittenberg

Client: DUHA Fertigteilbau GmbH

Erection of a food industry‘s delicatessen production facility using column, beam and truss construction with pre-stressed hollow core concrete floors, including reinforcement and concrete work

 

2012

            
       
Neuenkirchen chicken breeding farm

Client: BWE Baufertigteilwerk GmbH

Assembly of 140 columns with shaped foot and sandwich plates

 

2011

              
       
Varel paper and cardboard factory

Client: Herrmann Geithner & Söhne GmbH & Co. KG

Annex of a stock preparation during operation. Assembly of columns and beams using the Peikko system

 

2011

-

2010

              
       
BBI - Berlin-Brandenburg International Airport

Client: BAM Deutschland

Assembly of the airline passenger terminal colonnades, consisting of an exposed concrete column and beam construction

 

2010

-

2009

              
       
Dachser logistics center Hvidovre, Copenhagen

Client: Depenbrock Bau

Assembly of a logistics hall (column and beam construction) and office building (multi-story building with pre-stressed hollow core concrete floors)

 

2009

                
       
Sennheiser in Wedemark

Client: DW Systembau

Assembly of a production hall for Sennheiser

 

2009

          
       
Kaufland Neubrandenburg

Client: BFR Rostock

Assembly of a shopping center with adjoining parking garage, incl. the assembly of high-quality black sandwich clinker facades

 

2009

            
       
Bauhaus do-it-yourself store in Lübeck

Client: Klebl GmbH Rinteln

Assembly of a do-it-yourself store in skeleton construction

 

2009

              
       
"Gentofte Sygehus" hospital, Copenhagen

Client: HOFFMANN A/S

Assembly of 4 multi-story buildings and an intermediate building in an existing hospital courtyard, incl. structural work

 

2009

-

2008

            
       
Dessau shopping center (ARGE MRT - Allton)

Client: ZECHBAU

Assembly of constructive concrete prefabricated parts

 

2008

                  
       
Engine maintenance hangar Hamburg airport Fuhlsbüttel

Client: DW Systembau

Assembly of constructive prefabricated parts, among them pre-stressed concrete roof trusses

 

2008

          
       
Wustermark outlet center

Client: Züblin Berlin

Assembly of an outlet center village using prefabricated parts

 

2008

              
       
"Kontorhus Gladsaxe" office building, Copenhagen

Client: HOFFMANN A/S

Assembly of constructive concrete prefabricated parts, including structural work of the false ceilings

 

2007

        
       
CCB shopping center in Hamburg Bergedorf

Client: DW Systembau

Assembly of a shopping center in skeleton construction with tubular columns, trusses, beams and firewalls

 

2007

          
       
DELL-Computer office building in Halle

Client: STRABAG Berlin

Assembly of a building and call center in multi-story construction

 

2007

-

2006

            
       
Hamburg Bergedorf parking garage

Client: Köster Bau Osnabrück

Assembly of filigree floors and clinker facades

 

2006

        
       
famila shopping center in Jever

Client: Herrmann Geithner & Söhne GmbH & Co. KG

Assembly of a shopping center with merchandise receipt

 

2006

        
       
Motel One in Berlin

Client: Gustav Epple Stuttgart

Assembly of a 9-story hotel with massive exterior as well as inner walls and filigree floors

 

2006

        
       
Berlin Neukölln shopping center

Client: Allton

Assembly of constructive concrete prefabricated parts and exposed concrete / sandwich clinker facades

 

2005

      
       
CITTI shopping park in Kiel

Client: Köster Bau Osnabrück

Assembly of a shopping mall, an administration building and an annex under the existing roof. Assembly of constructive prefabricated parts and sandwich clinker facades. Crawler and telescopic cranes weighing up to 500 t were used.

 

2005

                
       
Logistics hall, Kremmen

Client: Allton

Assembly of a logistics hall

 

2005

        
       
Sphairon Salzenforst

Client: Betonwerk Spittwitz

Assembly of a production facility for Sphairon (network technology)

 

2005

                  
       
Nordmilch Edewecht dairy

Client: Herrmann Geithner & Söhne GmbH & Co. KG

Assembly of 3 dairy production buildings, pillars, beams, firewalls, heaviest elements up to 50 t

 

2004

                  
       
Areal northern railway station administrative building, Berlin

Client: Allton

Assembly of administrative buildings for Deutsche Bahn AG using multi-story construction, a combination of in-situ concrete and the prefabricated part construction method

 

2004

                
       
Hamburg paper factory in Schwarze Pumpe

Client: Strabag / Max Bögl

Assembly of a paper machine, stock preparation, roller bearings and corrugated board factory

 

2004

-

2003

              
       

 

Assembly of 140 columns with shaped foot and sandwich plates