Stair tower in the Bröring Co. Dinklage

Client: DUHA Fertigteilbau GmbH

Joining together prefabricated staircase frame elements and stairs to create a 30-m high stair tower, connect and cast with HBS rods.

 

2011

          
       
Limburg parking deck

Client: Ed. Züblin AG / Fertigteilwerk Gladbeck

Erection of a multi-story parking deck with surface-finished coverings (roadway elements) mounted with a vacuum lifting device.

 

2011

                
       
XXXLutz furniture store in Malmö, Sweden

Client: BFR Rostock

Assembly of a furniture store with columns beams and ceilings in an existing hall, as assembly under the roof with a Citykran

 

2010

          
       
SCA stair tower, Aschaffenburg

Client: Dreßler Bau Stockstadt

Assembly of a 42-m high freestanding stair tower

 

2010

        
       
Promenade at the "Wave", Vejle, Denmark

Client: Vejle Kommune

Erection of a precious wood terrace on a steel substructure, built on driven piles in the Vejle fjord on the Baltic Sea, assembled above the water as public promenade 

 

2009

              
       
"Bölgen" appartment building-The Wave, Vejle, Denmark

Client: Bertel Nielsen A/S

Assembly of a composite construction made of concrete prefabricated parts, pres-stressed elevator shafts and steel structure. Architect: Henning Larsen, Copenhagen. Includes foundation structural work and delivery of the complete steel structure

 

2009

-

2008

                
       
Impuls Arena Augsburg, football stadium, Arge MRT - Allton

Client: BAM Deutschland

Assembly of a football arena with social areas and offices

 

2009

-

2008

                
       
Lido fitness center in Vejle, Denmark

Client: Bertel Nielsen A/S

Erection of a fitness center in an existing building, in-situ concrete with steel construction (Peikko delta beams) and composite ceilings

 

2008

        
       
Dresden football stadium

Client: BAM Deutschland

Assembly of a special construction, which consists of columns, saw tooth beams, beams, stand elements and other prefabricated parts

 

2008

                
       
Airbus Hamburg, run-up facility

Client: DW Systembau

Assembly of a slanted noise protection wall for the engine testing plant of the Airbus A380

 

2006

              
       
Airbus Hamburg, painting shop und SLW shop

Client: DW Systembau

Assembly of a vertical stabilizer warehouse and paint shop with up to 21-m-high swivel supports and 16-m-high wall elements. Assembly with a 200-t crane on existing cellar floors during flight operations directly on the runway

 

2006

                
       
New German Museum Berlin, Museum Island

Client: Arge Dywidag / Dressler Bau

Assembly of top-quality exposed concrete prefabricated parts with special cranes, vacuum lifting devices and other lifting equipment in the existing museum building

 

2006

-